Medium Frequency Furnace Easy To Realize Mechanization, Automation And Flow Production
Overview of intermediate frequency furnace:
The medium frequency furnace is composed of frequency conversion device, furnace body, furnace front control, etc. the power supply is easy to move and is convenient to be used with other equipment; Using the principle of electromagnetic induction, it can meet the heating requirements of smelting, quenching and diathermy. It is environmentally friendly and pollution-free, and is very suitable for universities, laboratories and factories.
Technical parameters of intermediate frequency furnace
Model: LC-ZP-550
Power supply: three-phase four wire 380V 50-60Hz
Input power: 550KW
If range: 3.1khz
Load rate: 100%
Input power: 550A
Boundary dimension:790 * 1050 * 1550mm
Operating rules of intermediate frequency furnace:
1. Before starting the machine, check whether the equipment body is in good condition and whether there is any circuit short circuit or safety hazard caused by the presence of foreign matters; Start the water circulation system and check whether the water channels such as the medium frequency power supply, the medium frequency furnace body and the compensation capacitor cabinet are smooth and whether there is water leakage. If it exists, first eliminate the potential problems of the equipment to avoid the expansion of the fault.
2. Check whether the three-phase incoming power supply of intermediate frequency power supply is normal.
3. Check whether the connection between the power distribution cabinet and the induction furnace is intact. The exposed part of the induction ring should not be attached to metal objects to prevent the induction ring from being damaged by fire.
4. Under the condition that all the above are intact, the control power can be sent to the door panel.
5. Turn the power adjustment potentiometer on the door panel counterclockwise to "0" minimum.
6. Press the start button of the main circuit switch to close the circuit breaker and connect the main circuit.
7. Turn on the if start button.
8. Amplify the power setting potentiometer on the door panel clockwise bit by bit until the heating process requirements.
9. Purpose of fault display lamps on control circuit board